Construction precautions for gypsum-based self-leveling floor

Release time:2021-11-19 09:40

During the construction process, if you want to use gypsum-based self-leveling materials, there are requirements for the construction environment. Before construction, the ground should be cleaned, and the ground moisture content should be kept below 90%, and the ambient temperature should not be lower than 10℃. During the construction process, the wind should not be too strong to avoid the gypsum-based self-leveling material from drying too quickly in some areas.

During the construction process, if you want to use gypsum-based self-leveling materials, there are requirements for the construction environment. Before construction, the ground should be cleaned, and the ground should be kept moist, below 90%, and the ambient temperature should not be lower than 10℃. During the construction process, the wind should not be too strong to avoid the gypsum-based self-leveling material from drying prematurely in parts.

During the construction process, gypsum-based self-leveling materials have high requirements for the ground. The ground cannot contain loose impurities, grease, or concrete. If there is dust, it should be cleaned, and the ground ditches, drains, and partition seams should be sealed with sponge strips. The style seams left by the original cushion layer should also be sealed with the same material as the mortar.

Before applying the bonding agent for gypsum-based self-leveling, the surface of the bonding agent must be kept dry, just as before the self-leveling construction, to ensure better connectivity. During the construction process, attention should also be paid to ventilation. The water source used during the construction process should be clean tap water to avoid affecting the quality of the surface appearance of the gypsum-based self-leveling material.

The construction of gypsum-based self-leveling materials cannot be stopped halfway. The time used after adding water is half an hour. If this time is exceeded, the self-leveling mortar will gradually solidify, increase in strength, and lose its fluidity. The construction width of gypsum-based self-leveling materials can be determined according to the capacity of the equipment and the thickness of the spread. It usually does not exceed 12 meters. If the width of the ground is too wide, sponge strips can be used to divide it into different areas for construction.

After the gypsum-based self-leveling mortar is poured, the initial opening of windows for ventilation and drying should be treated differently according to the different characteristics of the supplier's materials. When pure semi-aqueous gypsum is used as the binder, window ventilation should not be earlier than 24h. When Type II anhydrous gypsum or a binder system containing cement and Type II anhydrous gypsum is used, window ventilation should not be earlier than 72h.

In gypsum-based self-leveling mortar containing a heating system, when using heating for drying, first use natural ventilation for drying for 2-3 days before starting to use heating-assisted drying.

After the construction of the gypsum-based self-leveling floor is completed, strong winds, air currents, and high temperatures should be avoided during the curing period. When the temperature or other conditions are different from the normal construction environment conditions, the curing time needs to be adjusted accordingly. During the finished product protection period, no garbage, sundries, paints, or construction machinery should be placed on the finished self-leveling floor to avoid contamination; blunt or sharp objects should not be used to strike or scratch the surface layer of the self-leveling floor, and people should not walk on it.